Client: District of Highlands
Read DescriptionOn Point Project Engineers, in conjunction with environmental consultants, prepared the design and received Ministry approval to replace two existing culverts at the District of Highlands Fire Hall with 2400 x 1800mm reinforced concrete box culverts. These culverts were partially embedded to facilitate the passage of fish.
The desirable window for the installation of these two culvert replacements was a short period during the summer months. The work began mid-August 2023 and all instream work was completed by mid- September, 2023. On Point also provided tendering support services to the District of Highlands.
.